COMPACTION GROUTING Denver-system
■Organization Profile
Organization name | CPG Development Institute |
---|---|
Headquarter | 〒108-0014 4-6-12 Siba,Minato-ku, Tokyo |
TEL・FAX | TEL.03-6665-8991 FAX.03-6436-3736 |
info@cpg-all.org |
■What's CPG
■Principle
Pressure injection of mortar having very low flowability into ground without giving impact or vibration forms a body of solidified mortar in the specified position without the mortar veing scattered.
■Work System
■Features
●Static press-in compaction
●Compact equipment
●Applicable to hard ground
●Degree of improvement selectable depending
●Easy to apply to existing structures
■Application Examples
In works for facilities in use or works at narrow places, compaction grouting,Denver system, is so effective that it can be said to be unrivaled.
■Construction Procedure
● 1 BORING
Set up the Boring Machine at the specifically marked area.
All Waste,including slime, produced during boring will be recoverd completery.
● 2 MORTAR PREPARATION
Special aggregate prepared with our firm's proprietary formula.
Mortar supplied by the most efficient constant mixing system. → Enforcement of rigorous material management, including slump tests.
● 3 INJECTION
Special-purpose, heavy-duty pump for pressure injection of mortar with low flowability.
Small lift equipment of the injection tube. → Step-by-step lifting mechanism, with a step set to a standard height of 33cm.
Flow rate and pressure monitory system for rigorous contorol of morter injection. → Step up with 1 step 33cm (standard)
● 4 Construction completed