COMPACTION GROUTING Denver-system

■Organization Profile

Organization name CPG Development Institute
Headquarter 〒108-0014
4-6-12 Siba,Minato-ku, Tokyo
TEL・FAX TEL.03-6665-8991  FAX.03-6436-3736
E-mail info@cpg-all.org

■What's CPG

■Principle
Pressure injection of mortar having very low flowability into ground without giving impact or vibration forms a body of solidified mortar in the specified position without the mortar veing scattered.

■Work System

■Features
●Static press-in compaction
●Compact equipment
●Applicable to hard ground
●Degree of improvement selectable depending
●Easy to apply to existing structures

■Application Examples
In works for facilities in use or works at narrow places, compaction grouting,Denver system, is so effective that it can be said to be unrivaled.

■Construction Procedure
● 1 BORING
Set up the Boring Machine at the specifically marked area.

All Waste,including slime, produced during boring will be recoverd completery.


● 2 MORTAR PREPARATION
Special aggregate prepared with our firm's proprietary formula.

Mortar supplied by the most efficient constant mixing system. → Enforcement of rigorous material management, including slump tests.


● 3 INJECTION
Special-purpose, heavy-duty pump for pressure injection of mortar with low flowability.

Small lift equipment of the injection tube. → Step-by-step lifting mechanism, with a step set to a standard height of 33cm.

Flow rate and pressure monitory system for rigorous contorol of morter injection. → Step up with 1 step 33cm (standard)


● 4 Construction completed